Second Day Back
It seems a cold snuck it way in over the move, hopefully it is gone in a day or 2. Well I had to get serious with Sawyer on the way so leaving MQT I swung by Menards. I told the guy in the little blue vest, which way to your cheapest hardwood laminate flooring. I found the 26 sq ft bundles for $18 bucks a moment later. Load me up good man and I was on my way. I had to unpack quite a bit over day one but then I had room to work. So todays project was the first square of flooring. Next phase I have to move the stove and fridge and start making some longer cuts for the little hallway. Well here it is so far. This is a no glue snap together, but from advice from C. Johnson I added about 5-6 dabs of wood glue on my longer seams, I will let it dry for a day before phase 2. I am glad QC1 supplied a 12″ chop saw, although it is about1/4″ to short to buzz the full width of the flooring. Shop at Qc1 for affordable project tools, it sure beats buying new for a small project.

